Know more! The course of events until the introduction of leased lines

Abstract

I will introduce the state of affairs for telecom operators before the opening of exclusive lines and the struggle that it was before their construction.

Installing an exclusive line, contrary to the easily installable B FLETs line and mobile lines, takes a long time (standard more than 3 months). I often receive requests from costumers for shorter installing times.

Regarding the opening of Exclusive lines and the shortening of service delivery dates, there are many cases in which we need the cooperation and the understanding not only from the telecom operators but also from the client and the datacenter. I would like to discuss with the audience the best ways to make everyone happy and present suggestions of what is thought to be the general solution to these problems.

Presenter

Tomohiro Onodera (ARTERIA Networks Corporation)